
AIMS Attachment A: AIMS Statement of Work
Page 39 of 130
C. Provided Goods shall meet the following requirements:
1. Electrically powered Equipment shall be UL approved.
2. Electronic Equipment shall meet the requirements of CFR 47 Part 15.
D. Items of the same classification shall be identical. This requirement
Includes equipment, modules, assemblies, parts, and components.
E. All similar types of personal computers and servers shall be of the same
manufacturer.
F. All similar types of peripherals shall be of the same manufacturer.
2.3.7 Monitoring By the County
A. The County will perform a Quality Monitoring role, closely monitoring
performance of the CONTRACTOR‟s Quality Control Program as to its
effectiveness. The basic measure of effectiveness is that the work is
performed correctly the first time. Secondarily, if a problem does occur,
must be immediately taken by the CONTRACTOR to correct the problem
and to make sure it will not occur again.
B. The County inspectors will spot-check construction primarily for determine
whether the CONTRACTOR‟s Quality Control Program is functioning.
County inspection does not supplement CONTRACTOR inspection.
County testing is independent of CONTRACTOR testing and does not
replace or complement CONTRACTOR Quality Control Testing.
C. All items of materials and Equipment shall be subject to quality control
surveillance by the County at the point of production, manufacture or
shipment to determine if the producer, manufacturer or shipper maintains
an adequate inspection system which insures conformance to the
applicable specifications and drawings with respect to materials,
workmanship, construction, finish, functional performance and
identification. In addition, all items of materials, equipment and work in
place shall be subject to surveillance by the County at the site for the
same purposes. Surveillance by the County does not relieve the
CONTRACTOR of performing quality control inspections of either on-site
or off-site CONTRACTOR‟s or subcontractor‟s work, relieve
CONTRACTOR of any of the requirements imposed on CONTRACTOR
by the Contract Documents.
D. Upon determination by the County that an item will require surveillance by
the County at the point of production, manufacture or shipment, the
CONTRACTOR will be notified in writing of such determination. The
CONTRACTOR shall furnish to the County three (3) copies of all purchase
orders, for all tiers of subcontractors or suppliers for each such item. Also,
Kommentare zu diesen Handbüchern