AIMS Attachment A: AIMS Statement of Work
Page 9 of 130
EVIDS) and integrated to ensure that displayed information is current. In
addition, to the end users, a single data entry update shall update all
information in both EVIDS systems. The CONTRACTOR shall include in
the Project Plan a detailed procedure of how these parallel systems will be
implemented and how the cutover to the new EVIDS will occur.
D. Historical information (minimum five (5) years) from the existing Resource
Management System shall be migrated to the AIMS to allow for retrieval of
historical data. The interface required to achieve this functionality shall be
included in an Interface Design Document that describes the interface
between the existing system and the AIMS.
E. The DAPP and CUSS implementations will be performed in stages with
the individual airlines for each stage identified in Section 1.6.6. of this
Statement of Work. Unless written approval from the County is obtained,
all stages of the DAPP and CUSS implementations must be completed
prior to Final Acceptance.
F. Phase Zero
1. The initial phase of the project (Phase Zero) will consist of the
development, submittal, and acceptance of the Project Plan that
includes an overall Project Schedule. In addition, this phase will
include the review, analysis, and acceptance of existing systems,
software, and components that will be utilized by, or integrated with the
AIMS and the submission of a formal deliverable stating the
acceptance and/or listing any items requiring modifications. This
review and subsequent documentation will include logic drawings
showing equipment quantities and logical connectivity.
G. Phase One
1. Phase One of the implementation will consist of the development of the
final design, system, equipment, and component submittals,
County/tenant coordination workshops, and Factory Acceptance
Testing ("FAT").
2. This phase will also include of the development and finalization of all
Interface Design Documents as specified herein.
3. In Phase One the CONTRACTOR shall develop, coordinate, and
administer design workshops to finalize the following components with
input from the required stakeholders. The exact list of workshops
along with each workshops agenda shall be submitted for review and
approval by the County. These design workshops shall included, but
not be limited to, the following:
i EVIDS distribution architecture and display driving technical
workshop
Exhibit 3
Page 69 of 278