AIMS Attachment A: AIMS Statement of Work
Page 10 of 130
ii Screen formats and displayed information workshops (all displays)
iii Tenant Gate Operational functionality workshops (i.e. boarding
sequence, etc.)
iv Airline functional requirements workshop with all airlines
v Detailed technical requirements workshop for all airlines identified
for implementation in stage one of DAPP. These airlines are
identified in Section 1.6.6 of this Statement of Work.
vi Resource Management System functional workshops
vii AIMS report workshops.
4. Development and implementation of a test lab at the FLL site. The test
lab shall include the following, as a minimum:
i A two server cluster configuration that will provide a scaled down
version of the production system. The configuration shall allow for:
a Application testing
b Application updates
c Server patch testing
d Database patch testing
e Symantec storage foundation patch set testing
ii EASE ticket and gate counter workstation configurations will all
associated peripherals. This configuration shall allow for:
a Installation and configuration of airline software
b Testing and validation of software upgrades
c Training area for airline staff
iii FIDS displays to be used for layout design and to allow on-site staff
members to monitor the FIDS in production.
iv AODB/RMS workstations
v CUSS Kiosk
5. Installation of the AIMS head-end equipment and all access layer
(LAN) components. This will include the installation of hardware and
the operating system(s).
6. Installation of the AIMS head-end equipment and all access layer
(LAN) components. This will include the installation of hardware and
the operating system(s).
7. Performance of Factory Acceptance Testing. Factory Acceptance
Testing shall be performed no later than ninety (90) calendar days after
successful submittal of the final software specifications. Testing shall
Exhibit 3
Page 70 of 278