
AIMS Attachment A: AIMS Statement of Work
Page 86 of 130
D. When modifications are performed to certain areas of data, the RMS shall
support the “re-building” of the affected areas only i.e., a complete
schedule re-build will not be required.
E. The planning mode of all modules shall support multiple planning
scenarios that can be individually saved. All saved scenarios shall have
the capability to be input into active mode.
F. Resource status shall be updated using text, color coding, and other
graphical coding (e.g., flashing). The color-code shall be user definable.
G. The Gantt chart shall be able to display contiguous resource allocations
for multiple days. The User shall be able to easily and dynamically adjust
the amount of time displayed from a minimum range of eight (8) hours to
four (4) calendar days.
H. Pan and zoom features shall be provided. The zoom shall allow
increasing/decreasing the number of resources and/or time frame
displayed up/down to the maximum and minimum time frame. Pan shall
allow the user to dynamically change the portion of the Gantt chart being
displayed.
I. The real-time Gate Module shall provide a graphical representation of an
aerial view of the Airport in addition to the Gantt chart view. On this
display gate status shall be updated using aircraft icons, color-coding, and
other graphical coding. The user shall be able to toggle between the
Gantt chart and aerial view when in real-time Gate Management mode.
J. The system shall provide standard templates for developing schedules
and planning. The ability to create user definable templates shall also be
provided
K. The user shall be able to assign resources to resource groups and easily
display one (1) or more resource groups dynamically as needed (for
example, DAPP stands may be one (1) group and remote stands another
group).
L. The system shall be able to display both allocated resources and
unassigned resources.
M. The RMS shall provide standard and custom reporting capabilities.
N. Various levels of access shall be definable and controlled based on user
login. The following levels of access shall be provided at a minimum:
1. View: User shall only be able to view planning and real-time
information. The user shall not be able to make any changes.
Exhibit 3
Page 146 of 278
Kommentare zu diesen Handbüchern